The TPO Roof Installation Process: A Step-by-Step Walkthrough

What actually happens on a commercial TPO reroof, from tear-off to warranty registration — explained in plain English.

The TPO Roof Installation Process: A Step-by-Step Walkthrough

Pre-construction

A proper TPO reroof starts weeks before crews arrive: submittals to the manufacturer, permit filing, insurance certificates, HVAC coordination, and building-owner communication about noise and access.

On the roof

  • Tear-off of existing system to deck
  • Deck repair and re-nailing
  • Vapor barrier + polyiso insulation + cover board
  • Membrane rolled and mechanically attached (or fully adhered)
  • All seams hot-air welded and probed
  • Perimeter and penetration flashings