The TPO Roof Installation Process: A Step-by-Step Walkthrough
What actually happens on a commercial TPO reroof, from tear-off to warranty registration — explained in plain English.
Pre-construction
A proper TPO reroof starts weeks before crews arrive: submittals to the manufacturer, permit filing, insurance certificates, HVAC coordination, and building-owner communication about noise and access.
On the roof
- Tear-off of existing system to deck
- Deck repair and re-nailing
- Vapor barrier + polyiso insulation + cover board
- Membrane rolled and mechanically attached (or fully adhered)
- All seams hot-air welded and probed
- Perimeter and penetration flashings